[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

RE: [PSUBS-MAILIST] Kreideseesub





Hi Emile and Carsten,

    Is it to late to compliment you on your latest sub project Kreideseesub?  I enjoyed watching the Youtube clip of Emile moving the bow half sphere into position. 

I'm thinking I want one of your over pressure valves in the bottom of my sub to let out extra internal pressure as well as easily drain all the water out of my K-250 after fully flooding it for wet exit training at depth. All I would have to do is lock the hatch and let some air out of the SCUBA tank(s) at a rate that doesn't over take the valve.  Then when one is ready to surface, just remove the water from the VBT so you go slowly to the surface. This way the air that is in the cabin at pressure can come out of the over pressure valve at a reasonable rate. It sounds to simple. Perhaps I'm missing some thing.


Regards,

Szybowski





From: emile@airesearch.nl
To: personal_submersibles@psubs.org
Subject: RE: [PSUBS-MAILIST] Kreideseesub
Date: Tue, 20 Jan 2009 19:02:18 +0100

Hi Vance,

 

The hull is constructed right at this moment!.  I  build and a professional welder does the welding. Great team!!

I started last week and with a few days the heavy steel work is done.  The picture site will be updated soon.

 

We have to preheat thick steel here cos it is les than 5 C. inside..

 

Front viewport is 580 mm O.D @ 135 Deg.

 

Best regards, Emile

 

Alkmaar, the Netherlands

 

 

 


Van: owner-personal_submersibles@psubs.org [mailto:owner-personal_submersibles@psubs.org] Namens vbra676539@aol.com
Verzonden: dinsdag 20 januari 2009 11:16
Aan: personal_submersibles@psubs.org
Onderwerp: [PSUBS-MAILIST] Kreideseesub

 

Emile,

Hello from Florida. The weather here was 25C yesterday, but with a lot of wind. Not a good day for small submarines offshore, I'm afraid, so I have been writing about my version of the Kreideseesub. In my book, it is May and the sub is working on the seabed north of Iceland. And the weather is very nice, but cold. No one gets seasick in my book unless I say so!!!

I see the Kreideseesub hull components are built. How is the fabrication going? I am anxious to see the interior layout. What diameter is the forward viewport?

Hope all is well with you in Germany. Happy New Year. May it be a prosperous and successful one for you.

Best Regards,
Vance




-----Original Message-----
From: Emile van Essen <emile@airesearch.nl>
To: personal_submersibles@psubs.org
Sent: Fri, 12 Dec 2008 6:26 am
Subject: [PSUBS-MAILIST] Drebbel to Kreideseesub

Hi,

 

The plan of my earlier mentioned project “Drebbel” chanced a little.

The owner of the divebase at lake Hemmoor wanted to have a sub.

Specs are pretty close to my earlier plans so Carsten and I made a agreement with him. We design and produce parts and the sub will be sold as a building kit.

http://ww w.airesearch.nl/index_bestanden/Page424.htm  click on “kreidesseesub” I hope to inspire people with the picture log!

We hope to launch in summer 2009.

 

Best regards, Emile van Essen

 

 

 

 

 


Which stars will make the biggest headlines in 2009? Get Hollywood predictions, celebrity holiday photos and more with the PopEater Toolbar.

No virus found in this incoming message.
Checked by AVG - http://www.avg.com
Version: 8.0.176 / Virus Database: 270.10.9/1900 - Release Date: 19-1-2009 20:52