[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

RE: [PSUBS-MAILIST] Mushroom Vent CAD Assembly Options





Ok good, that was what I was thinking would be the case, but I didn't really know for sure. 


Szybowski





To: personal_submersibles@psubs.org
Subject: Re: [PSUBS-MAILIST] Mushroom Vent CAD Assembly Options
Date: Sat, 10 Jan 2009 18:37:09 -0500
From: vbra676539@aol.com

The three way just vents it through a bronze muffler fitting into the main cabin. Even at 2250 psi, the volume is miniscule. I'll get back to you on the pistons.
Vance


-----Original Message-----
From: Brent Hartwig <brenthartwig@hotmail.com>
To: PSUBSorg <personal_submersibles@psubs.org>
Sent: Sat, 10 Jan 2009 2:46 pm
Subject: RE: [PSUBS-MAILIST] Mushroom Vent CAD Assembly Options


Thanks Vance,
 
What brand and model of single line pneumatic actuator were you looking at using?   As it turns out my current assembly only needs 1 to 1.5 inches movement in the acturator. For a single line unit, when the air pressure is released from the actuator, where does that air go?  I'm guessing it goes into the cabin unless it's plumbing outside or into a empty tank.


Szybowski






To: personal_submersibles@psubs.org
Subject: Re: [PSUBS-MAILIST] Mushroom Vent CAD Assembly Options
Date: Fri, 9 Jan 2009 21:30:55 -0500
From: vbra676539@aol.com

Cool graphics.
Vance


-----Original Message-----
From: Brent Hartwig <brenthartwig@hotmail.com>
To: PSUBSorg <personal_submersibles@psubs.org>
Sent: Fri, 9 Jan 2009 7:35 pm
Subject: [PSUBS-MAILIST] Mushroom Vent CAD Assembly Options


Greetings SMMOMs,
 
I've been working on a number of different ways to configure my version of a Mushroom vent for the front and rear MBT's on my K-250. This is the one I like the best so far.
 
http://cid-5085d10eb6afe47c.skydrive.live.com/browse.aspx/Plunger%20Assembly
 
 
 http://cid-5085d10eb6afe47c.skydrive.live.com/browse.aspx/Mushroom%20Vent%20Concept%20Main%20Assembly
 
 
 
It's mostly made up of 1/4" X 1" 316 SS bar stock, and 1" thick black UHMW. So the goal is for it to be easy and affordable to make and assemble. I made a mock up of the single line, spring loaded pneumatic cylinder Vance was talking about, which I would like to use in this assembly.  I will need to trim away some material on the plunger land, and the piece cut out when I made the whole in the FRP MBT, that meets the bottom of the FRP MBT, and then attach them with Seka flex and SS screws.  This way I can have a clean look on the top area of the MBT's, and the angle I have to mount the vent on aids in letting almost all the air out. The very small air pockets left I'm thinking will not be an issue. I thought mounting the vent this way would be better for my application, since the knuckle curvature of the heads and the high point of the MBT's are in the same area.
 
I'm interested in your guys thoughts on this concept design. I've uploaded three screen capture clips of the assembly animated on Youtube.  The quality is not that great on Youtube, so if anyone would like better quality versions of these clips, let me know off list and I'll send them to you.
 
 
 http://www.youtube.com/watch?v=YvIc3qRRgv8&feature=channel_page
 
 http://www.youtube.com/watch?v=S6D0iMgqgzk&feature=channel
 
http://www.youtube.com/watch?v=tdBap4iVoGQ&feature=channel




Regards,
Szybowski


=
=