James,
The original K-350 design uses cables to transfer the power from each
battery pod to the hull. I researched the company that made the original
cables and couldn't find it. I assume they went out of business since the
design was made up. Those cables connected into the stainless steel rings
welded into each pod and ran up to two similar rings welded in the aft hull
end cap. I spoke to the Captain about it and he said he did it that way
because one of the certifying agencies or a purchaser (I forget which)
required the cables and would not let him connect directly through to the
hull. I'm sure there are other companies that make similar cables if you
want to go that route, but I'd check what their through hull connection
requirements are. You may need threaded rings or something different then
the design.
I decided to save the money all that would be and do it with more labor
instead. I made those big bulky chunks of steel with a separate hole for
each conductor. My conductors are brass threaded rods. Each rod passes
through plastic spacers, and is held in with nuts and washers on each end.
The void around the rods is totally filled with epoxy. No gas can leak
through, and if a pod blew, water won't enter the hull. My only danger is
if I have a total melt down. The epoxy and plastic can melt but the nuts
and washers should still hold the rods in place, although they might not be
totally water tight.
Don't eliminate the 2X pipe connections. You'll need them to vent your pods
while charging. I leave mine open any time I'm not diving the sub. 2X pipe
is hard to find so I just got a chunk of 1018 bar stock and turned and bored
it to match what 2X pipe would be.
If you look at pics of my battery pods you will see that I originally put
the cable connections in them but then changed my mind and made stainless
steel caps for the connection points.
Dan H.
----- Original Message -----
From: <james@guernseysubmarine.com>
To: <personal_submersibles@psubs.org>
Sent: Thursday, June 05, 2008 11:35 AM
Subject: [PSUBS-MAILIST] Penetration problems
Hi All.
Not sure this will get through the spam filter with that title :)
Anyway, could someone give me a hand with this. K350 plans.
Im getting all the through hulls sorted and ive come up all confused.
Most through hulls are drawn in detail and look simple enough, but the main
power through hull looks like its missing information to me.
For the battery pods, there are 2x vents (which i am not actually going to
install as vents) and the main power through hull. There is a "main power
through hull" shown on the plans but it just seems to be a hull reinforcment
ring and i cant find anywhere the details for the actual electrical
connection part. ?? Im sure i have all the pages, so im assuming its yet
another thing thats missing?
Also, Dan H and John Farrnington both put the main power through hull in
line with the vents, which seems correct, but im sure on the plans it shows
the main power through hull in a different place. ???
However, i did look rather briefly at lunch time, so i might have missed a
page or something. Will double check again when i get back from work but i
thought id just see what you all think.
Thanks as always
James
************************************************************************
************************************************************************
************************************************************************
The personal submersibles mailing list complies with the US Federal
CAN-SPAM Act of 2003. Your email address appears in our database
because either you, or someone you know, requested you receive messages
from our organization.
If you want to be removed from this mailing list simply click on the
link below or send a blank email message to:
removeme-personal_submersibles@psubs.org
Removal of your email address from this mailing list occurs by an
automated process and should be complete within five minutes of
our server receiving your request.
PSUBS.ORG
PO Box 53
Weare, NH 03281
603-529-1100
************************************************************************
************************************************************************
************************************************************************