[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[PSUBS-MAILIST] test / UC-3 update...



Dear Psubbers,
 
 
Here in Copenhagen work on UC-3 is as intensive as ever. The list of problems to be solved before launch is getting shorter - and shorter but if you start with 1.2472.836.564 problems - it also has to bee
 
The engineroom has been epoxypainted. The fresh watertank instaled. All engines have been instaled. Propeller, and propellershaft is mounted. The main compressor has been delevered. A couple of tonnes of batteries will arrive soon. Four extra MEGA windows for the controlroom are being machined by CNC factory...80 mm thick acrylic are being water jet cut. Its good times. I spend my time off designing a personal spacecraft, and have ordered a tank of liquid oxygen ( rocket oxydizer ) but this is off topic ofcause.
Inside UC-3´s officers mess outfitting are continuing with paint and insulation beeing applyed. Airplane style aluminum boxes with hatches are instaled for stoving room.
 
Building and designing this ship is an exelent way of getting a clear and defined goal in life...and its like a drug...a few days with no UC-3 activities ( such as when I must make money ) gets me into bad condition...except if it caused by Anne, who can always distract me...
 
Good luck to your all...
 
Peter   


Jeg beskyttes af den gratis SPAMfighter til privatbrugere.
Den har indtil videre sparet mig for at få 27616 spam-mails
Betalende brugere får ikke denne besked i deres e-mails.
Hent en gratis SPAMfighter her.