Status Report  ..................from Brian Cox
 
Project :  ESMAE   Electric SubMersible with Articulating Entry
 
Progress:  1) Have posted my preliminary design on the moki exchange.  (however it keeps changing and morphing hourly). 
                   2) Have build scaffolding for construction of outer superstructure shell  ( ferro-cement construction)
                   3) Have built moch-up of pressure hull (so I can get an idea where all these valves are going to go, also for testing the cable connections for my stick and rudder controls, and also for testing the scrubber and O2 monitor.)
 
Continuing Education:  Taking machine shop class at Ventura collage.
 
Current reading:  Structures (or why things don't fall down)
 
Comments:  Though I'm sticking to my basic design concept of a " Flip" sub.  I've realized that I really do not need trim tanks and I will balance the sub with weights.  I've moved my air for buoyancy outside the shell and replaced that space with more flotation capacity.  I am currently playing with the size of my hard ballast tank that will bring the nose of my craft up horizontal and ready for cruising, since the nose will be heavy with the battery pod( a benefit when flipped).
 
Future Goals:    1) Settle on design and start on steel matrix for ferro-cement shell.
                           2)  Start diving more with Bob http://covenantdivecharters.com/ 
                           3)  get certified for rebreather equipment