[Date Prev][Date Next] [Chronological] [Thread] [Top]

No Subject



Update on Cannuckius Kittredgus's currently abuilding K250...I have most of the air lines run inside, one more to go.. Stainless Steel..it looks nice. the air valves are installed, they are a toggle valve, and seem to work very well, (so far)..I have 2 seperate air systems... one for the rear main ballast tank, the other for the variable/front ballast system.. I am now on my 3rd retaining ring for my dome.. the other 2 didnt work out...I have most of the building on the drop weight done, and have my through-hull shafts built for the motors..conning tower seal surface is machined, and hinge built and installed...Ill have more pics in a short time...
 
 
One other thing.. I chose the name Snooper for my sub, but I noticed that there is another sub talked about on the psub list lately with the same name.. (is it bad maners/or inappropriate/ unlucky/ etc.. to choose a name that someone else has used ???) if so.. I need ideas for other names....if it is ok from the submarine society, then It will be Snooper..  (Cannuckius Kittredgus is too long..)
 
thanks all..