[PSUBS-MAILIST] Fw: mould

hank pronk via Personal_Submersibles personal_submersibles at psubs.org
Sun Feb 7 16:59:39 EST 2016


Alan, The centre hole is quite large so it will be easy to reach, the actual fibreglass  portion is only 19 inches from the edge to the centre opening.  Good idea, I am sure I will need a sail of some sort, I was thinking a 1\4 inch thick acrylic oval thing.I am planning electric valves for venting, I had 100% success with them on my log salvage ROV and we did a kazillion cycles and the only trouble we had was they would freeze at the surface before the sink cycle.  Easy solution, it was to damn cold to be on the water anyways. :-)Hank 

    On Sunday, February 7, 2016 2:49 PM, Alan James via Personal_Submersibles <personal_submersibles at psubs.org> wrote:
 

 Thanks Hank,have fun. You might need to build a scaffold over that to get tothe center. The thought came to mind that you could embed bolts on the back side of it, around the hatch area, & thenbolt on a self draining conning tower for when it is needed.Alan 

      From: hank pronk via Personal_Submersibles <personal_submersibles at psubs.org>
 To: Personal Submersibles General Discussion <personal_submersibles at psubs.org> 
 Sent: Monday, February 8, 2016 10:26 AM
 Subject: Re: [PSUBS-MAILIST] Fw: mould
  
Alan,Yes the centre will be cut out and 3 inches of the sphere will protrude.  It is not clear in the picture, but the entire top is sloped 1.5 inches over 19 inches, to allow for venting.Hank 

    On Sunday, February 7, 2016 2:19 PM, Alan James via Personal_Submersibles <personal_submersibles at psubs.org> wrote:
 

 Hank,I'm not sure what you are doing here.There is a circle drawn in the middle, is this cut out & will the MBT be fitted around the hatch. As it is the top I am surprized it is flat as the air won't rise to a central point to be exhausted.Alan

      From: hank pronk via Personal_Submersibles <personal_submersibles at psubs.org>
 To: Personal Submersibles General Discussion <personal_submersibles at psubs.org> 
 Sent: Monday, February 8, 2016 9:58 AM
 Subject: [PSUBS-MAILIST] Fw: mould
  
This is one half of the mould for the MBT slash trawl float house on Elementary 3000  After this part is glassed up, then the bottom portion will be formed and the two halves will be married together.  There will be a second set of moulds to encase the HP and O2 tanks.  This whole process will take me all next week to complete.  Hank

     On Sunday, February 7, 2016 1:53 PM, xxx xxxxx <mp13 at live.ca> wrote:
 

  


   
_______________________________________________
Personal_Submersibles mailing list
Personal_Submersibles at psubs.org
http://www.psubs.org/mailman/listinfo.cgi/personal_submersibles


   
_______________________________________________
Personal_Submersibles mailing list
Personal_Submersibles at psubs.org
http://www.psubs.org/mailman/listinfo.cgi/personal_submersibles


   
_______________________________________________
Personal_Submersibles mailing list
Personal_Submersibles at psubs.org
http://www.psubs.org/mailman/listinfo.cgi/personal_submersibles


   
_______________________________________________
Personal_Submersibles mailing list
Personal_Submersibles at psubs.org
http://www.psubs.org/mailman/listinfo.cgi/personal_submersibles


  
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://www.whoweb.com/pipermail/personal_submersibles/attachments/20160207/0011b793/attachment.html>


More information about the Personal_Submersibles mailing list