This section is a summary of loads to be considered when
designing your submersible.
A load plan is to be submitted for the pressure hull, external loads
& internal loads. Section 4 F, table 4.2 has a summary of 35 relevant loads
& the tests required. The tightness tests (leak test by pulling a vacuum) are
at .2 bar below atmospheric pressure.
The relationship of the nominal diving pressure ( maximum operating depth )
the test pressure & collapse diving pressure, are dependent on the depth
you build for. For instance, down to a depth of 165 ft the test depth is 1.7
times operating depth, & the designed collapse depth should be 3.2 x the
maximum operating depth. Down to 330 ft it is 1.4 & 2.4 Down to 660 ft it is
1.25 & 2.
Section 4 F, table 4.2 has a summary of 35 relevant loads & the tests
required. The tightness tests (leak test by pulling a vacuum) are at .2 bar
below atmospheric pressure.
Alan
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://www.whoweb.com/pipermail/personal_submersibles/attachments/20131205/a8960d49/attachment-0001.html>
More information about the Personal_Submersibles
mailing list