Great day Jim. Looks very pretty. Congratulations. Hugh From:
owner-personal_submersibles@psubs.org
[mailto:owner-personal_submersibles@psubs.org] On Behalf Of kocpnt
tds.net Hi All, First Launch 5-4-2010 at about 4:30 PM - Lake Michigan. Went well. A bit tail heavy I think. No leaks except a small
one at the conning tower o-ring just as submerging. Controls worked well as did
the thrusters. I will do some ballast changing prior to the next outing. All in
all a great launch, much anticipated after about 5 years. Best Regards, Jim K __________ Information from ESET NOD32 Antivirus, version of virus signature
database 5089 (20100505) __________ The message was checked by ESET NOD32 Antivirus. http://www.eset.com __________ Information from ESET NOD32 Antivirus, version of virus signature database 5092 (20100506) __________ The message was checked by ESET NOD32 Antivirus. http://www.eset.com |