[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: [PSUBS-MAILIST] Git Kraken



In a message dated 10/23/2009 5:24:28 P.M. Pacific Daylight Time, vbra676539@aol.com writes:
Hey, Frank. When are you going to the water? You better get crackin' on Git Kraken. I'd like to see it in Ft. Pierce next summer.
Vance
Hi Vance. I'm working hard to get ready. Currently welding the stainless ballast tanks together. The FRP is 95% done.
 Motor mounts, dive planes, rudders, etc. all done except for the electric actuators. Hatch is done. Windows ready for plexi.
Next is putting in the floor and window ribs, then the battery racks. These racks will hold the stainless battery boxes, air tanks, electrical panel, air manifold, etc. I want to be able to remove all that stuff so I can clean and/or re-paint as needed on a basically bare hull.
I have most of the plumbing parts and am getting ready to drill in the thru-hulls.
I hope to dunk test early next year and drive test by spring. I haven't found anyone to make windows yet.
Frank D.