I have just posted couple of new pics on my frapper.
I went with schedule 80 1/2 inch black pipe welded in for
my Air and 02 thru hulls.
I think shedule 40 would handle my depths, but I had a difficult
time finding threads with any quality. They were all very sloppy.
I found a supplier locally with the sced 80's and they are nice.
I plan on running to the out board air tanks and vents with the same
sche 80's I am using JB weld for pipe dope as these will never be changed,
and I have had really good luck with this epoxy and think it is a cheap insurance
policy for no future leaks at joints.
Hope I am not of target here
Dean Ackman Start the year off right. Easy ways to stay in shape in the new year. |