dpeth rating 1000ft
basic hull shape
standard k350 lay out
streached
view ports
dome
18 inch fwd
24 inch conning tower
24 tube shape to complete conning
tower
option others
propulsion
4 ea. 2hp minn kota pressure comp motors
2 main propulsion
2 verticule
control system
plc based controls with joy stick and touch screen
interface. hyd controls for rudders and external valves
minipulator
6 ft with 300 lb lift capacity
operation time
6 hrs at 25% power level
life support
72 hrs. emergency mode
hull pentrator plates
interchanable due to service
requirments
no mechanical pentrations hyd or elec
only
displacement
6000lbs
battrey bank
8ea t1275 in 2 48 volt
banks
emergency ballast
battery banks positive lift 800 lbs
soft ballast
two saddle tanks 2000lbs
hard ballast
none
trim tank
vented trim tank with depth controled by plc based
pid controler reason, thin and light wieght, mission profile require decent to
depth and return without bouncing around. the air required to maintain decent
rate is already need for accent.
crew support
co2 analizer optionAL IF VISABLE SCRUBBER
CANISTERS ARE USED BUT WANT IT JUST THE SAME.
MULTI SENSOR O2 ANALIZER for o2 injection with
the help of the plc
comm
full surface comms both sides
lights and video
500 watts of light and video
basic cost of 50,000 dollar
status of design
hull 75%
systems
hyd 100%
drives 100%
life support 65%
electrical 45%
rick miller
current estamated cost for certified vessel 200,000
dollars
including xray of a welds, certification of al;l
prots, abs welding certification program, abs certified valves, and tank testing
of primary structure
|