[Date Prev][Date Next]
[Chronological]
[Thread]
[Top]
Building Updates - was Re: [PSUBS-MAILIST] Hull failure calculation sheet
Hi Peter any update news from your second boat ? New pictures for Moki ?
Last thing I build was the overhead seamap holder made from 1/2 inch
strong clear acrylic. And the electric driven remote controlled main
ballst tank ball vales. At the moment I build the freshwater- and the
wastewater tanks. Both made from stainless steel. Next step will be
during winter time the casing for the about 100 batteries. I estimate
that this will need about two months.
regards Carsten
Peter Madsen schrieb:
>