The issue of beam seems to be causing a lot of concern. I want to
be able to sit upright in the hull. I'm not interested in crouching
or being balled-up in any way. Furthermore, 1.5-2.5 meters was the
unanimous response. It would seem, however, that there are a lot of
second thoughts on this. I am going to try laying out some stuff in
my living room to get a better idea of scale. I think this is the
first order of buisiness at this time. Please, all, make a mock up
with sticks, cardboard, or whatever, and get a solid understanding of
a realistic size. It is starting to sound like the 1.5 meters may have
been closer to the target. Remember, though, that the modularity will
allow the basic sub to be quite short, eliminating some cost/weight
concerns.

Warren.

> 
> Any special tools that we need should be factored in
> to the overall cost.  This would include the method of
> transporting it to and from the dive site.  If 'we' are
> planning to build a submarine of the size people are talking
> about then you will probably need either a crane or strong
> forklift truck for lifting parts and section into place.
> 
> Although, it might be more econimical to get a vehicle
> such as a flat bed truck with a built on crane:
> http://cgi.ebay.com/ebaymotors/ws/eBayISAPI.dll?ViewItem&category=6729&item=2400013033
> 
> The specs being kicked around sounds more like the size of
> a 4 to 6+ person sub, with room to stand up.  I've got
> say I would love to have a sub like that, but I'm not
> sure how relistic it is to solve all the logistical problems
> for constructing such a vessel by a private individual.
> In fact I think hardly any one would beable to finance
> and construct such a vessel, more so since this is intended
> as a 'first submarine'.  1 meter is a more realistic hull
> diameter...  your second sub could be 2 meters....
> 
> Ian.
> 
> On Thu, 16 Jan 2003 00:08:05 +0800
> "Warrend Greenway" <dub@linuxmail.org> wrote:
> 
> > If this bolt together systems works out then Carsten's idea of
> > uneven lengths becomes perfect. We would have around a 4 meter
> > "main" section with the conning tower. Then you could either bolt 
> > on end-cap sections or extensions to the hull, either way you get
> > exactly the length you want. It would be nice if towing behind an
> > SUV wasn't a concern, but it is. I would get a Dodge and have
> > 10,000lbs towing capacity, but that is not going to be a popular
> > solution. "By a real truck for your PSUB!" Right. 
> > 
> > Warren.
> > 
> > > The wish list looks like it's coming along well.  I like the "Required "
> > > list especially, but I think the size is getting a little large for
> > > something that will actually get built?
> > > 
> > > Maybe one of the first things that should be considered is, are we looking
> > > to design a sub that can be trailered behind a standard sized SUV or pickup
> > > truck, or one that requires more to move it.  Establish the displacement
> > > constraints rather then the details.
> > > 
> > > Establishing a realistic budget may do well early on too.  It's probably the
> > > main reason there aren't a flood of Psubs in the water already.
> > > Keep in mind, every square center meter of volume adds to both cost and
> > > weight.
> > > 
> > > My hat is off to Carstan for the project he has taken on, but reality is, I
> > > know he's way out of my league.
> > > 
> > > Dan H.
> > > 
> > > ----- Original Message -----
> > > From: "Coalbunny" <coalbunny@vcn.com>
> > > To: <personal_submersibles@psubs.org>
> > > Sent: Wednesday, January 15, 2003 7:40 AM
> > > Subject: Re: [PSUBS-MAILIST] OSS spec sheet
> > > 
> > > 
> > > > I don't know what value this would be to the PSUB project, but this is
> > > > what I have so far-
> > > >
> > > > 1. Length:  "Around" 10 meters
> > > > 2. Beam: 2-2.5 meters
> > > > 3. Speed:  unknown
> > > > 4. Depth:  50 meters
> > > > 5. Duration:  24 hours
> > > > 6. Cost: unknown
> > > > 7. Capacity:  3-4 passengers
> > > > 8. Other:  Optional electronics package
> > > >            Life support system
> > > >            Optional bow view port
> > > >            Optional fiberglass fairings
> > > >            Required analog/mechanical gauges
> > > >            Required auxillary electrical
> > > >            Required steel pressure hull
> > > >            Required drop ballast
> > > >            Required "trimable" ballast
> > > >            Required PWM speed control(?)
> > > >
> > > > I'm not really certain what the specs would be for speed.
> > > > Carl
> > > >
> > > > --
> > > > "You delight not in a city's seven or seventy wonders, but in an answer
> > > > it gives to a question of yours, or the question it asks you, forcing
> > > > you to answer, like Thebes through the mouth of the Sphinx." -- Kublai
> > > > Khan
> > > >
> > > 
> > > 
> > 
> > -- 
> > ______________________________________________
> > http://www.linuxmail.org/
> > Now with POP3/IMAP access for only US$19.95/yr
> > 
> > Powered by Outblaze

-- 
______________________________________________
http://www.linuxmail.org/
Now with POP3/IMAP access for only US$19.95/yr

Powered by Outblaze