Hi
We have a K-350 2 man sub which is about 1/2
finished.
1. The hull is framed and welded and ready
for end caps to be welded on (we have the end caps)
2. Battery pods are weld together ready to be
welded to the sub.
3. Conning tower insert is welded into
sub.
4. Conning tower has all view ports welded in
and ready to weld onto insert.
5. All thru hulls are machined
and ready for installation.
We are interested
in selling this sub to someone who is looking to build a K-350